End device
Sensor, meter or valve actuator. It measures, sends a short message and goes back to sleep – at a 15-minute interval, for several years on one battery.
Knowledge
The deadlines from the Building Modernisation Act (GModG) at a glance, every obligation with its legal reference so you can look it up, and the radio technology behind it explained in four steps.
Deadlines
All information refers to the Building Modernisation Act as amended by the amending act of 23 July 2026; regulations as of October 2026.
The amended GModG applies. For non-residential buildings over 70 kW, the deadline for building automation under § 56 starts to run.
Go to the obligationsNon-residential buildings over 70 kW need building automation under § 56(2) and automatic lighting control (§ 56(6)).
Does this apply to me?CO₂ at workplaces under ASR A3.6 (German technical rule for workplace ventilation), energy management under ISO 50001, technical monitoring under VDI 6041 – where a contract or regulation requires it.
Building Modernisation Act (GModG)
Every obligation under the Building Modernisation Act with its legal reference: who it applies to, what it requires and what Sensise contributes. Below that, three further sets of rules that building operators often check at the same time.
Non-residential buildings with a rated output of more than 70 kW for a heating system, combined space heating and ventilation system, air-conditioning system or combined air-conditioning and ventilation system. The wording does not distinguish between existing and new buildings; both are covered. Exception: technically not feasible or economically unreasonable. Fine of up to €5,000 (§ 108(1) no. 7, from 1 January 2027 no. 8).
The system must be capable of: 1. continuously monitoring, logging and analysing the consumption of all main energy sources and of all technical building systems, and adjusting consumption, 2. making the collected data “accessible via a common and freely configurable interface so that analyses can be carried out independently of companies and manufacturers”, 3. setting requirement values for energy efficiency, 4. detecting efficiency losses in technical building systems, 5. informing the building operator about improvements, 6. “monitoring indoor climate quality”.
The same non-residential buildings over 70 kW, existing and new. Exception if the equipment is technically impossible or economically unreasonable. A fine is not provided for; § 108 only refers to subsection 1.
Sentence 1 is a must provision: the building “must … be equipped with automatic lighting control”. Sentence 2 is a should provision: the control “should be appropriately zoned and have occupancy detection”.
Equipping heating systems with an automatically acting device for room-by-room control. Fine of up to €50,000, although under § 108(1) no. 13 expressly only for a breach of subsection 1, sentence 1.
§ 63 is not amended by the amending act of 23 July 2026 and continues to apply in its previous version. We take the exact wording of the subsections, in particular on retrofitting in existing buildings, from the consolidated version; it is not contained in the promulgated text.
Operator obligation when a heating system is installed or set up. Fine of up to €5,000 (§ 108(1) no. 11). The scope is set out in subsection 1, which is not changed by the amending act.
The newly worded subsection 2 reads: hydraulic balancing comprises the necessary planning and implementation services, “in particular the heat load calculation and the necessary adjustment of heating surfaces and controls”. The heat load calculation must be carried out in accordance with DIN EN 12831-1:2017-09 in conjunction with DIN/TS 12831-1:2020-04 “or using an equivalent method”.
Employer obligation for workplaces in enclosed work rooms, such as offices, town halls and classrooms (for the teachers; pupils are not employees). In church settings: sacristy, congregation and parish offices yes, the church interior itself no. Edition January 2012, last amended GMBl 2018 p. 474.
The ASR specifies § 3a(1) and § 4(3) of the Workplaces Ordinance (ArbStättV) in more detail. The assessment parameter is the CO₂ concentration. Below 1,000 ppm no measures are needed. Between 1,000 and 2,000 ppm ventilation must be improved and a ventilation plan drawn up; above 2,000 ppm further measures are needed. Presumption of conformity: if the employer applies the ASR, they may assume that they comply with the ordinance.
Organisations with an energy management system. Voluntary unless required by law. The Energy Efficiency Act (EnEfG) requires companies with an annual consumption of more than 7.5 GWh and public bodies with 1 GWh or more to have energy management, and from 3 GWh an energy or environmental management system.
An energy management system requires defined metrics, an energy baseline and regular monitoring, measurement, analysis and evaluation of energy performance. The underlying improvement cycle is called Plan, Do, Check, Act.
A private guideline with no legal effect of its own. Binding only if a contract or tender refers to it. Relevant for public clients via AMEV Recommendation No. 178 “Technisches Monitoring 2025” (Technical Monitoring 2025).
The guideline distinguishes between energy monitoring, system monitoring and building and comfort monitoring, and separates commissioning monitoring from long-term monitoring. It is process-oriented and technology-neutral.
Radio standard
A reading passes through four stations on its way from the sensor to the time series. Each has a name that appears in quotations.
Sensor, meter or valve actuator. It measures, sends a short message and goes back to sleep – at a 15-minute interval, for several years on one battery.
The radio receiver in the building, usually one per building. We measure the range on site before quoting – reinforced concrete and geometry are what matter, not the distance in kilometres.
Manages the radio connections and checks whether a message is genuine. Operated by The Things Industries in a data centre in the Frankfurt area.
Translates the message into readings and stores the time series – this is the Sensise platform. Payload data is encrypted with AES-128; we hold the key.
Open standard
The LoRa Alliance maintains the LoRaWAN® standard and certifies devices. You are free to choose gateways and sensors; if you change provider, the devices remain usable. We connect an existing application on The Things Industries or the community network without migration.
Figures from the LoRa Alliance, as of September 2026 (press release).
| Term | Meaning |
|---|---|
| EU868 | The licence-free 868 MHz band designated in Europe for this radio standard. |
| Uplink and downlink | The radio message from the device to us, and the command from us to the device, such as a new setpoint. |
| Class A | The most energy-saving operating mode. The device is ready to receive only briefly after transmitting, which is why a setpoint takes effect with a delay. |
| Spreading Factor | The setting that trades range against data rate. Transmitting further means transmitting more slowly. |
| AES-128 | The symmetric encryption method with a 128-bit key length that the device uses to encrypt its payload data. |
| OTAA | The join procedure when the device is first switched on, during which the session keys are exchanged. |
Frequently asked questions
The monitoring obligation under § 56 GModG applies to non-residential buildings, such as administrative buildings, schools, office and commercial properties, whose heating, air-conditioning or ventilation system, including combined systems, has a rated output of more than 70 kW. Existing and new buildings are covered equally. The Compliance check gives you an initial assessment for your property.
§ 71a of the German Buildings Energy Act (GEG) required building automation for non-residential buildings with heating, air-conditioning or ventilation systems above 290 kW rated output, with a deadline of 31 December 2024. In the Building Modernisation Act (GModG), the rule is now in § 56. There the threshold is 70 kW, and the deadline is 31 December 2029.
The amended Building Modernisation Act has been in force since 29 July 2026 (amending act of 23 July 2026). The key deadline for operators of non-residential buildings is 31 December 2029: by then, buildings over 70 kW must be equipped with building automation under § 56(2) and automatic lighting control under § 56(6).
The Act lists six capabilities: continuously monitoring, logging and analysing the consumption of all main energy sources and technical building systems; making the data accessible independently of the manufacturer via a common, freely configurable interface; setting requirement values for energy efficiency; detecting efficiency losses; informing the building operator about improvements; and monitoring indoor climate quality.
The collected data must be available in such a way that any company can analyse it, not just the manufacturer of the system. The Sensise platform outputs all measurement series as a CSV file, continuously via MQTT and via the REST API. The devices transmit via LoRaWAN®, an open standard, and remain usable even if you change provider.
The assessment parameter is the CO₂ concentration in the indoor air. Below 1,000 ppm no measures are needed. Between 1,000 and 2,000 ppm ventilation must be improved and a ventilation plan drawn up; above 2,000 ppm further measures are needed. The rule applies to workplaces in enclosed rooms, and therefore also to offices, town halls and classrooms. Sensise assigns the readings to these ranges and reports exceedances during operation.
Companies with an annual consumption of more than 7.5 GWh and public bodies with 1 GWh or more need energy management, and from 3 GWh an energy or environmental management system, for example in accordance with ISO 50001. This requires defined metrics and an energy baseline. The platform records these values continuously for each meter and building and exports them for energy management.
LoRaWAN® is an open radio standard for low-power sensors in the licence-free 868 MHz band. Around 150 million devices are deployed worldwide. At a 15-minute interval, a sensor transmits for several years on one battery. Payload data is encrypted with AES-128, and the network and application servers run in a data centre in the Frankfurt area.
As a rule, one gateway covers an entire building. At Wissenbach primary school, one gateway receives 40 field devices. Reinforced concrete and building geometry are decisive, which is why our installation network measures the range on site before quoting, including for basements, shafts and underground car parks.
Write to us about what you need – we reply within one working day (Monday to Friday). Or we can go through your property together in 30 minutes.