Knowledge

What building operators face, and when.

The deadlines from the Building Modernisation Act (GModG) at a glance, every obligation with its legal reference so you can look it up, and the radio technology behind it explained in four steps.

Deadlines

Two key dates and ongoing obligations

All information refers to the Building Modernisation Act as amended by the amending act of 23 July 2026; regulations as of October 2026.

  1. 29.07.2026

    Act in force

    The amended GModG applies. For non-residential buildings over 70 kW, the deadline for building automation under § 56 starts to run.

    Go to the obligations
  2. 31.12.2029

    Monitoring obligation

    Non-residential buildings over 70 kW need building automation under § 56(2) and automatic lighting control (§ 56(6)).

    Does this apply to me?
  3. ongoing

    No fixed date

    CO₂ at workplaces under ASR A3.6 (German technical rule for workplace ventilation), energy management under ISO 50001, technical monitoring under VDI 6041 – where a contract or regulation requires it.

Building Modernisation Act (GModG)

The GModG in detail

Every obligation under the Building Modernisation Act with its legal reference: who it applies to, what it requires and what Sensise contributes. Below that, three further sets of rules that building operators often check at the same time.

Start compliance check
Operational monitoring and building automation§ 56(1) and (2) GModGin force since 29 Jul 2026 · deadline 31 Dec 2029
Applies to

Non-residential buildings with a rated output of more than 70 kW for a heating system, combined space heating and ventilation system, air-conditioning system or combined air-conditioning and ventilation system. The wording does not distinguish between existing and new buildings; both are covered. Exception: technically not feasible or economically unreasonable. Fine of up to €5,000 (§ 108(1) no. 7, from 1 January 2027 no. 8).

Requirement

The system must be capable of: 1. continuously monitoring, logging and analysing the consumption of all main energy sources and of all technical building systems, and adjusting consumption, 2. making the collected data “accessible via a common and freely configurable interface so that analyses can be carried out independently of companies and manufacturers”, 3. setting requirement values for energy efficiency, 4. detecting efficiency losses in technical building systems, 5. informing the building operator about improvements, 6. “monitoring indoor climate quality”.

What Sensise contributesWe supply data for no. 1 (consumption), no. 2 (interface) and no. 6 (indoor climate quality), as a CSV file, via MQTT and via the REST API. We do not monitor the building services equipment itself. Whether a building meets the requirements is assessed by a specialist engineering firm.
Automatic lighting control§ 56(6) GModG31 Dec 2029
Applies to

The same non-residential buildings over 70 kW, existing and new. Exception if the equipment is technically impossible or economically unreasonable. A fine is not provided for; § 108 only refers to subsection 1.

Requirement

Sentence 1 is a must provision: the building “must … be equipped with automatic lighting control”. Sentence 2 is a should provision: the control “should be appropriately zoned and have occupancy detection”.

What Sensise contributesOur contribution is the sensors: presence and brightness values as input variables, plus switching actuators that switch lighting according to a schedule. Luminaires and lighting control are supplied by the electrical contractor.
Room-by-room control of room temperature§ 63 GModGon installation and replacement
Applies to

Equipping heating systems with an automatically acting device for room-by-room control. Fine of up to €50,000, although under § 108(1) no. 13 expressly only for a breach of subsection 1, sentence 1.

Requirement

§ 63 is not amended by the amending act of 23 July 2026 and continues to apply in its previous version. We take the exact wording of the subsections, in particular on retrofitting in existing buildings, from the consolidated version; it is not contained in the promulgated text.

What Sensise contributesThe valve actuators control each room according to its own schedule. Whether the requirement is met in an individual case is assessed by the specialist contractor responsible for planning.
Hydraulic balancing§ 60c GModGnew subsection 2 from 1 Jan 2027
Applies to

Operator obligation when a heating system is installed or set up. Fine of up to €5,000 (§ 108(1) no. 11). The scope is set out in subsection 1, which is not changed by the amending act.

Requirement

The newly worded subsection 2 reads: hydraulic balancing comprises the necessary planning and implementation services, “in particular the heat load calculation and the necessary adjustment of heating surfaces and controls”. The heat load calculation must be carried out in accordance with DIN EN 12831-1:2017-09 in conjunction with DIN/TS 12831-1:2020-04 “or using an equivalent method”.

What Sensise contributesSelf-adaptive thermostats take over steps in adjusting heating surfaces and controls. The heat load calculation is prepared by a specialist contractor or energy consultant.

Further regulations outside the GModG

Ventilation in workplacesASR A3.6ongoing
Applies to

Employer obligation for workplaces in enclosed work rooms, such as offices, town halls and classrooms (for the teachers; pupils are not employees). In church settings: sacristy, congregation and parish offices yes, the church interior itself no. Edition January 2012, last amended GMBl 2018 p. 474.

Requirement

The ASR specifies § 3a(1) and § 4(3) of the Workplaces Ordinance (ArbStättV) in more detail. The assessment parameter is the CO₂ concentration. Below 1,000 ppm no measures are needed. Between 1,000 and 2,000 ppm ventilation must be improved and a ventilation plan drawn up; above 2,000 ppm further measures are needed. Presumption of conformity: if the employer applies the ASR, they may assume that they comply with the ordinance.

What Sensise contributesCO₂ measurement provides the trend that shows how effective a ventilation measure is, and reports exceedances during operation rather than after the fact. The risk assessment itself is prepared by the employer.
Monitoring, measurement, analysis and evaluationISO 50001 6.6 and 9.1ongoing
Applies to

Organisations with an energy management system. Voluntary unless required by law. The Energy Efficiency Act (EnEfG) requires companies with an annual consumption of more than 7.5 GWh and public bodies with 1 GWh or more to have energy management, and from 3 GWh an energy or environmental management system.

Requirement

An energy management system requires defined metrics, an energy baseline and regular monitoring, measurement, analysis and evaluation of energy performance. The underlying improvement cycle is called Plan, Do, Check, Act.

What Sensise contributesThe platform records these metrics continuously, retains them for twelve months and exports them. This means the baseline comes from actual operation rather than from an estimate. Certification is carried out by an accredited certification body.
Technical monitoring of buildingsVDI 6041 2017-07to be agreed contractually
Applies to

A private guideline with no legal effect of its own. Binding only if a contract or tender refers to it. Relevant for public clients via AMEV Recommendation No. 178 “Technisches Monitoring 2025” (Technical Monitoring 2025).

Requirement

The guideline distinguishes between energy monitoring, system monitoring and building and comfort monitoring, and separates commissioning monitoring from long-term monitoring. It is process-oriented and technology-neutral.

What Sensise contributesWe supply measurement data and analyses for energy monitoring and for building and comfort monitoring during operation. We do not provide system monitoring or commissioning.

Radio standard

LoRaWAN® in four steps

A reading passes through four stations on its way from the sensor to the time series. Each has a name that appears in quotations.

01

End device

Sensor, meter or valve actuator. It measures, sends a short message and goes back to sleep – at a 15-minute interval, for several years on one battery.

02

Gateway

The radio receiver in the building, usually one per building. We measure the range on site before quoting – reinforced concrete and geometry are what matter, not the distance in kilometres.

03

Network server

Manages the radio connections and checks whether a message is genuine. Operated by The Things Industries in a data centre in the Frankfurt area.

04

Application server

Translates the message into readings and stores the time series – this is the Sensise platform. Payload data is encrypted with AES-128; we hold the key.

LoRa Alliance

Open standard

Sensise is a member of the LoRa Alliance

The LoRa Alliance maintains the LoRaWAN® standard and certifies devices. You are free to choose gateways and sensors; if you change provider, the devices remain usable. We connect an existing application on The Things Industries or the community network without migration.

LoRaWAN devices deployed
150 million
worldwide, growing by around 25% per year
Member companies
over 340
Manufacturers, network operators, integrators
Certified devices
over 695
tested for conformity with the standard
Products on the market
around 1,000
in the LoRa Alliance Marketplace

Figures from the LoRa Alliance, as of September 2026 (press release).

Terms that appear in quotations
TermMeaning
EU868The licence-free 868 MHz band designated in Europe for this radio standard.
Uplink and downlinkThe radio message from the device to us, and the command from us to the device, such as a new setpoint.
Class AThe most energy-saving operating mode. The device is ready to receive only briefly after transmitting, which is why a setpoint takes effect with a delay.
Spreading FactorThe setting that trades range against data rate. Transmitting further means transmitting more slowly.
AES-128The symmetric encryption method with a 128-bit key length that the device uses to encrypt its payload data.
OTAAThe join procedure when the device is first switched on, during which the session keys are exchanged.
Smart City Expo World Congress, Barcelona
3–5 Nov 2026 · Fira de Barcelona, Gran Via. Focus on municipal properties and building portfolios.
Book a meeting at the fair

Frequently asked questions

What building operators ask us first

Does the Building Modernisation Act also apply to our building?

The monitoring obligation under § 56 GModG applies to non-residential buildings, such as administrative buildings, schools, office and commercial properties, whose heating, air-conditioning or ventilation system, including combined systems, has a rated output of more than 70 kW. Existing and new buildings are covered equally. The Compliance check gives you an initial assessment for your property.

What has become of § 71a GEG?

§ 71a of the German Buildings Energy Act (GEG) required building automation for non-residential buildings with heating, air-conditioning or ventilation systems above 290 kW rated output, with a deadline of 31 December 2024. In the Building Modernisation Act (GModG), the rule is now in § 56. There the threshold is 70 kW, and the deadline is 31 December 2029.

Since when has the GModG applied, and by when must building operators act?

The amended Building Modernisation Act has been in force since 29 July 2026 (amending act of 23 July 2026). The key deadline for operators of non-residential buildings is 31 December 2029: by then, buildings over 70 kW must be equipped with building automation under § 56(2) and automatic lighting control under § 56(6).

What must a building automation system be able to do under § 56(2) GModG?

The Act lists six capabilities: continuously monitoring, logging and analysing the consumption of all main energy sources and technical building systems; making the data accessible independently of the manufacturer via a common, freely configurable interface; setting requirement values for energy efficiency; detecting efficiency losses; informing the building operator about improvements; and monitoring indoor climate quality.

What does “manufacturer-independent interface” mean in the GModG?

The collected data must be available in such a way that any company can analyse it, not just the manufacturer of the system. The Sensise platform outputs all measurement series as a CSV file, continuously via MQTT and via the REST API. The devices transmit via LoRaWAN®, an open standard, and remain usable even if you change provider.

Which CO₂ limits apply under ASR A3.6?

The assessment parameter is the CO₂ concentration in the indoor air. Below 1,000 ppm no measures are needed. Between 1,000 and 2,000 ppm ventilation must be improved and a ventilation plan drawn up; above 2,000 ppm further measures are needed. The rule applies to workplaces in enclosed rooms, and therefore also to offices, town halls and classrooms. Sensise assigns the readings to these ranges and reports exceedances during operation.

Who must introduce energy management under the Energy Efficiency Act (EnEfG)?

Companies with an annual consumption of more than 7.5 GWh and public bodies with 1 GWh or more need energy management, and from 3 GWh an energy or environmental management system, for example in accordance with ISO 50001. This requires defined metrics and an energy baseline. The platform records these values continuously for each meter and building and exports them for energy management.

What is LoRaWAN® and how secure is the radio transmission?

LoRaWAN® is an open radio standard for low-power sensors in the licence-free 868 MHz band. Around 150 million devices are deployed worldwide. At a 15-minute interval, a sensor transmits for several years on one battery. Payload data is encrypted with AES-128, and the network and application servers run in a data centre in the Frankfurt area.

How far does a LoRaWAN gateway reach inside a building?

As a rule, one gateway covers an entire building. At Wissenbach primary school, one gateway receives 40 field devices. Reinforced concrete and building geometry are decisive, which is why our installation network measures the range on site before quoting, including for basements, shafts and underground car parks.