Monitoring obligation § 56 GModG · by 31 Dec 2029

Measure. Alert. Control.

Sensise shows what is happening in your buildings and controls the heating room by room – without conversion work, with devices, platform and operation from a single source.

Sensise platform: building overview of the demo property Villa Marbella with temperature, humidity, CO₂, brightness, window status and three floors
up to 30%less heating energy¹
15.5%measured in the KIT field test²

¹ Upper limit from the Sensise savings calculator for buildings in efficiency class H. · ² Field study by the Karlsruhe Institute of Technology, three apartment buildings, heating period from November 2022.

Developed at Thermokon · Built on LoRaWAN®

  • Thermokon
  • LoRaWAN
  • The Things Industries
  • Enerfect
  • Sybtec
  • Müller Schaltanlagen
  • dnt

What Sensise does

Three things that keep a building under control

Measure

Temperature, air quality and humidity per room, consumption per meter – continuously stored and available at any time.

Alert

Thresholds on every measured variable, four alert levels, email notification – before a notice turns into damage.

Control

Weekly schedules per room, heating stops when a window is open, switching actuators for electrical loads – without intervening in the system.

Applications

Nine applications on one set of devices

One wireless network, one platform, one point of contact – and you decide where to start.

Discuss an application
  • 01

    Room temperature control

    Retrofit valve actuators on the radiators, weekly schedules per room, the pipework stays untouched.

  • 02

    Hydraulic balancing

    Make distribution visible and set valves based on measurements rather than guesswork.

  • 03

    Indoor air quality

    CO₂ thresholds under ASR A3.6 (German technical rule for workplace ventilation), ventilation prompt sent as an alert to those responsible.

  • 04

    Mould prevention

    Keep an eye on humidity and dew point in each room before stains appear on the wall.

  • 05

    Occupancy and presence

    Heat and ventilate rooms only when they are actually in use.

  • 06

    Leaks and moisture

    Report water on the floor early – not only when the caretaker spots it.

  • 07

    Door and window monitoring

    Heating stops when a window is open, alert if something is still open in the evening.

  • 08

    Energy monitoring

    Gas, water and electricity per meter, key figures for ISO 50001 and for compliance records.

  • 09

    Scheduled switching

    Switching actuators for electric heaters and other loads that only know on and off.

§ 56 GModG

From 70 kW, monitoring becomes mandatory.

The Building Modernisation Act (GModG) requires operators of non-residential buildings with heating, air-conditioning or ventilation systems above 70 kW rated output to install building monitoring – by 31 December 2029. Six questions show whether and how you are affected.

70 kWrated output at which the obligation applies
31 Dec 2029deadline for existing non-residential buildings
1,000 ppmCO₂ guideline value under ASR A3.6

Platform

All properties, one interface.

From the organisation overview down to the individual device – six levels on which every analysis is based.

  • Structure: organisation, building, floor, room, zone and device.
  • Analysis: trends per device, room and building section, comparison across periods.
  • Monitoring: rules per measured variable with freely chosen alert level and recipients.
  • Control: daily profile by the hour, separate weekend schedule, setback during absence.

Platform in detail

Monitoring rules for a property: nine rules for outdoor temperature, battery status, CO₂, windows, leaks and device availability, each with alert level and number of alerts

Example: monitoring rules for a property, each rule with alert level and number of alerts.

References

Buildings where the system is running

Eight properties in Hesse and Bavaria, including three primary schools and a grammar school.

All references

Sensise 8-in-1

Eight building blocks, one contact.

For measuring, alerting and control to work, eight building blocks have to fit together. We supply all eight and remain your point of contact – even when a partner company or your own staff carries out the installation.

View the eight building blocks

  • 01Consulting
  • 02End devices
  • 03Gateways
  • 04Installation
  • 05Network server
  • 06Application server
  • 07Platform
  • 08Support

30 minutes for your building.

We go through your properties with you and tell you what monitoring and control will achieve there – without obligation, by video call or on site.

3–5 November 2026: Smart City Expo World Congress, Barcelona – arrange a meeting at the trade fair